Utility scale
projects

portfolio for onshore power plants, agrovoltaics, flexibility aggregation and high demand projects

Make your project easier with Raylyst

Our comprehensive services include technical support, training, specialized logistics and tailored financing options.

The time always arrives
Wide range of products
Loyalty Benefits Program
Reward for loyalty
Technical service for your project
Consultation and service
Discover the benefits of our solar solutions

Referee studies

Our customers build the future

UTILITY SCALE PROJECT

Maximum Yield of the Oberndorf Power Plant Thanks to AIKO Technologies


Oberndorf bei Schwanenstadt, Austria

AIKO panels as the ideal choice for demanding applications, with a focus on performance, long-term energy yield, and modern design.

UTILITY SCALE PROJECT

Photovoltaic power plant at Levín Farm: modern technology set in a peaceful landscape

Estimated output: approx. 6 MWp

Implementation of the 6 MW Smart Transformer Station JUPITER-6000K-H1 and Huawei SUN2000-330KTL-H1

UTILITY SCALE PROJECT

Unique battery storage in an industrial area in the south of Moravia

Inspiration in green solutions

Implementation of Huawei Luna2000-2.0MWH Series

UTILITY SCALE PROJECT

The first delivered Smart Transformer Station Jupiter found its place in the premises of the West Bohemian Ceramic Works

Former ceramic factory Horní Bříza

Partner for large
and small businesses

Hundreds of clients trust us

“Cooperation with Raylyst is characterized by fast and smooth communication. We are very satisfied with the prices and the fast processing, which is very important to us. Thanks to this, we are able to quickly rework our customer projects.”

Eric

Efa Leipzig GmbH

“Contact is very easy, either by phone or email. Competent contact persons. Adjustments are quick and easy. Advice and support use a well-established network of specialists and are professional. Reliable workmanship is the standard here.”

Johannes Grossberger

Megasport GmbH

“We got to know them through the newsletter during a very complicated period in the Italian market. They immediately helped us solve many problems thanks to the availability of the products we needed at competitive prices. We were professionally assisted from the beginning and pleasantly surprised by the personal details. The owner personally visited us by car all the way from the Czech Republic!”

Carboff

Collaboration process
step by step

Our customers build the future

Enter the client zone
Registration, which takes just 3 minutes, gives you access to the biggest manufacturers.
Portfolio control
Rely on the experience of the Raylyst sales team and consultants. We are here for you!
Easy ordering
Take control of your shopping cart with a clear e-shop.
Reliable delivery
You can rely on our logistics. Your order will always arrive on time and in the right place.
Technical and warranty service
In our product range you will find only the highest quality products. That is why we are not afraid to provide warranty and service.
Raylyst loyalty program
We value and reward the trust of our long-term customers. Join them too.
Frequently asked questions

For utility-scale projects, we offer high-performance photovoltaic panels with an output of over 500 W, central and string inverters, battery systems for large-scale energy storage and ground-mounted structures. All products are optimized for large-scale projects with an emphasis on maximum efficiency and reliability.

We provide technical support during all phases of the project, from design to implementation. This includes installation system designs, energy yield simulations, selection of optimal components and adaptation of the design to the specific conditions of the project site.

For utility-scale projects, we provide transportation directly to the project site with the option of phasing deliveries according to the construction schedule. We work with leading logistics partners and guarantee punctual deliveries thanks to our warehouse capacities in Europe.

Yes, we offer individual quotes for utility-scale projects. Thanks to our long-term relationships with manufacturers, we can provide competitive pricing, including volume discounts and favorable payment terms.

The best
products for your project

Join us

Discover the benefits of our solar solutions

Your path to a sustainable future

Reference studies

Maximum profitability of the Oberndorf power plant thanks to AIKO technology

Oberndorf bei Schwanenstadt, Austria

Launch date: August 2025

Introduction

One of the most technologically advanced photovoltaic power plants in the region has been built in Oberndorf bei Schwanenstadt in northern Austria. The project, implemented by investor Pod Bau GmbH, combines a large-scale photovoltaic system with battery storage and charging infrastructure for electromobility.

In this prestigious project Raylyst Solar was responsible for the supply of AIKO high performance photovoltaic panels, a technology that is currently one of the most efficient on the world market.

Context and Challenges

The investor’s goal was to build an energy self-sufficient charging facility capable of covering the high demand of electric vehicle traffic at any time of the day – ideally without depending on an external energy source. The key requirements were maximum efficiency, high reliability and long-term yield in a limited area.

The installation was carried out under the direction of R&R Amering GmbH, which implemented the project with respect to the exact technological requirements and timeline.

Solution

At the heart of the entire photovoltaic part of the system are the high-end AIKO ABC (All Back Contact) panels supplied by Raylyst Solar. This technology represents the pinnacle of current developments in photovoltaic panels in terms of efficiency.

Thanks to the unique design with full-back contacts and the absence of front busbars, the panels achieve exceptional performance parameters. They also cope well with diffuse light, a major advantage in Austria’s variable lighting conditions. The high temperature resistance ensures stable performance even during the summer months. In addition to the technical parameters, they also impress with their elegant design. Thanks to the frameless, invisible design, the installation looks clean and uniform, which is particularly appreciated by investors who also place emphasis on the visual aspect of the project.

Thanks to these parameters, the system enables efficient use of every square metre of space, which is crucial for the economics of the entire operation in utility-scale projects.

Features and Benefits

AIKO technology brings to this project not only superior performance, but also stability, long life and minimal maintenance. Combined with advanced 6.8 MWh battery storage and intelligent demand management, the entire system is optimized for a high proportion of direct self-consumption and relief to the utility grid during peak times.

In addition, the chosen configuration allows for efficient night operation of the charging stations and flexible commercial output of surpluses to the grid, thus combining ecology with economic benefits for the investor.

Implementation

The project started in spring 2025 and was commissioned in August of the same year. Thanks to meticulous project preparation, professional installation by R&R Amering GmbH and the timely delivery of the technology from Raylyst Solar, the implementation was carried out without delay.

The whole project shows that a carefully selected technology and the right partner for the supply of components have a major impact on the quality and success of the final solution.

Results and Impacts

Thanks to AIKO panels, the new site can supply large volumes of clean energy for its own use and the surrounding infrastructure in a stable manner. The project also serves as a demonstration model for future combinations of PV systems, battery storage and high-performance e-mobility infrastructure.

Conclusion

The reference project in Oberndorf confirms that AIKO panels are the ideal choice for demanding applications with an emphasis on performance, long-term yield and modern design. Combined with professional installation and a smart energy concept, the result is a system that sets a new standard for similar projects in Austria and throughout Europe.

Join us

Discover the benefits of our solar solutions

Your way to a sustainable future

Reference studies

PV Power Plant at Levín Farm: Modern Technology Embedded in a Tranquil Landscape

Levín Farm, Hvězdonice, Czech Republic

Commissioning date: September 2025

Introduction

A new ground-mounted photovoltaic power plant has been built on the outskirts of Hvězdonice, situated within the scenic Central Bohemian landscape at Levín Farm. The project, developed by Archdevelo s.r.o., represents another step toward efficient renewable-energy generation. At the current stage, all produced energy is fed directly into the distribution grid.


The investor’s objective was to build a robust, long-term reliable system that leverages modern technologies to ensure efficient operation and simplified maintenance in the years ahead.

Context and Challenges

The installation is unique in its location—situated within the grounds of Levín Farm, near a trotting race track. The site was selected for its favourable solar conditions, optimal terrain orientation and the possibility of direct grid connection.
During the design phase, it was essential to combine high technical requirements with careful integration into the surrounding landscape. The goal was to create a modern power-generation facility that is reliable, high-performing and respectful of the natural environment.

Solution

The project employs a full Huawei technology stack, combining power-conversion, control and transformation components into a unified and compact system.

Raylyst Solar supplied a 6 MW Huawei Smart Transformer Station JUPITER-6000K-H1, ensuring reliable power transformation from the string inverters to a voltage suitable for grid connection.
On the power-conversion side, the plant features 19 Huawei SUN2000-330KTL-H1 inverters, which—thanks to their high efficiency and advanced control algorithms—ensure optimal utilisation of the energy produced.

Plant control and monitoring are handled by the Huawei Smart Array Controller SmartACU2000D, integrating all components into a single ecosystem and enabling remote supervision and real-time diagnostics. This setup reduces operational expenses while simplifying the management of the entire facility.

Features and Benefits

The unified Huawei FusionSolar ecosystem ensures high energy-conversion efficiency, operational reliability and simplified service interventions.
The combination of SUN2000-330KTL inverters, the SmartACU controller and the innovative STS results in efficient power transmission and stable operation even in demanding climatic conditions.
Thanks to full compatibility across all components from one manufacturer, the commissioning time was significantly shortened and the risk of technical mismatches between devices minimized.

Implementation

The project was carried out throughout 2025 and completed in September of the same year. Building on previous experience with Huawei technology in utility-scale installations, this project represents another milestone in expanding the FusionSolar platform in the European market.
Due to thorough preparation and precise coordination of all deliveries, installation proceeded smoothly and within the planned schedule.

Results and impacts

The photovoltaic plant at Levín Farm now contributes to the production of clean electricity fed into the distribution grid, strengthening the stability of the regional energy infrastructure.
The project demonstrates the effective use of modern Huawei technologies in combination with a carefully designed system that brings together performance, reliability and long-term sustainability in harmony with the surrounding environment.

Conclusion

The installation at Levín Farm confirms that Huawei’s advanced technologies are ideally suited for large-scale ground-mounted PV projects requiring high performance, stability and long service life.
This project further highlights the growing importance of renewable energy in the Czech Republic and expands the portfolio of major reference installations in which Raylyst Solar participates as a supplier and technical partner for the deployment of advanced technological solutions.

Join us

Discover the benefits of our solar solutions

Your path to a sustainable future

Reference studies

Unique battery storage in an industrial area in the south of Moravia

Hodonín industrial area Tabačka

Implementation date: 6 March 2024

Home

The Hodonín industrial complex Tabáčka, a former tobacco factory with a history of over 150 years, is located in a strategic position between Brno and Vienna.

The complex provides facilities for 45 companies that use production areas, offices and warehouses. Currently, the complex boasts another significant environmental step – the installation of a unique battery storage facility.

Context and challenges

The site is struggling with increasing energy consumption, mainly due to the tenants’ manufacturing operations and logistics operations dependent on electric vehicles.

Even so, thanks to the combination of a 1200 kWp solar power plant, cogeneration and newly installed battery storage, it consumes 99% only green energy.

Solution

In cooperation with the installation company, we have been looking for the optimal solution to the energy needs of the site now and in the years to come. In the end, the choice fell on a unique container battery with a capacity of 4 MWh and an output of 2 MV. The installation is also interesting because it includes several basic components that are modular and easily replaceable. Each container contains 6 separate cabinets with 21 batteries in each, allowing for easy maintenance and eventual replacement of damaged parts.

Features and Benefits

There are several key benefits to the battery storage chosen:

  • Energy optimisation: allows you to buy energy at cheap spot prices and postpone its consumption to times when electricity is expensive.
  • Smoothing of peak demand: reducing the reserved capacity of the site to a minimum and smoothing peak demand.
  • Promoting green traffic: The combination with photovoltaic power plant and cogeneration ensures maximum green operation of the site.

Implementation

The installation and commissioning of the storage was carried out by PV Service plus. The site’s energy system is connected to the local distribution system, but primarily focuses on self-supply. The project also includes a master control system specifically developed for the needs of the site. The test run involved simulating various crisis situations such as charging multiple electric vehicles and simultaneous operation of the production facilities.

Results and impacts

Battery storage significantly improves the energy efficiency of the site. However, working with energy is increasingly important for industrial sites not only because of the cost of energy – the reason for batteries is also the risk of grid overload and meeting ESG conditions. The installation in Tabačka serves as an inspiration for other similar projects due to its power-to-size ratio.

Conclusion

The demand for efficient battery storage in the Czech Republic is growing and the Hodonín Tabačka site can be an inspiration for other companies that are still looking for their way to sustainable operation of industrial sites. The project demonstrates the successful use of modern technologies and provides inspiration for other companies and investors looking for green solutions.

Join us

Discover the benefits of our solar solutions

Your path to a sustainable future

Case studies

Our First Delivered Huawei Smart Transformer Station Jupiter Installed at the Former West Bohemian Ceramics Plant

Former ceramics factory, Horní Bříza

Installation date: 29 April 2025

Introduction

At a former industrial site in Horní Bříza, where the buildings of the West Bohemian ceramics plant once stood, a new 3.7 MWp photovoltaic power plant is now under construction. For this project, we delivered our very first Huawei Smart Transformer Station Jupiter (3 MW) in the Czech Republic, along with other Huawei technologies for power conversion and system control.

Context and challenges

The site has undergone extensive revitalization in recent years, with the goal of creating new, efficiently usable areas. Installing a large-scale solar power plant at this location brings the advantage of leveraging existing infrastructure and strong grid connectivity.

One of the key project requirements was to ensure high-quality technology for reliable power transformation and to prepare the system for future advanced export control capabilities.

Technical Solution

For this project, we supplied the Huawei JUPITER-3000K-H1 Smart Transformer Station, which enables efficient power conversion from string inverters to a voltage level suitable for grid connection.

The delivery also included the Huawei SmartACU2000D-D-01 Smart Array Controller and Huawei SUN2000-330KTL-H1 inverters.

Huawei’s technology ensures high efficiency, reliable operation, and support for advanced export control functions.

The solution delivered for this installation includes 11 units of Huawei SUN2000-330KTL-H1 inverters, accompanied by a Huawei SmartACU2000D-D-01 Smart Array Controller communication unit. This integrated system—combining inverters, the communication interface, and the transformer station from a single manufacturer, Huawei—offers high efficiency, operational reliability, and support for advanced export control features.

Features and Benefits

The selected solution brings several key benefits to the project:

  • High-efficiency power conversion:
    The compact Smart Transformer Station enables straightforward installation and ensures high operational reliability.
  • Export control readiness:
    The use of the SmartACU2000D with SmartLogger prepares the system for the future implementation of dynamic export power control.
  • System flexibility:
    The combination of Huawei string inverters and the control system is scalable and allows for seamless

Implementation

The technology installation was carried out by Archdevelo s.r.o. The process ran smoothly thanks to thorough project preparation, careful site readiness for equipment placement, and overall high-quality project management by the implementation partner.

On our side, we delivered not only the complete technology package but also provided dedicated technical support—both during the project preparation phase and throughout the installation itself.

Results and impact

Once commissioned, this photovoltaic power plant will contribute clean energy to the distribution grid and will be ready to utilize advanced export control functions. We are proud that this project marked the delivery of our very first Huawei Smart Transformer Station Jupiter, strengthening our expertise in utility-scale projects and highlighting the potential of Huawei’s modern technologies in the large-scale solar segment.

Conclusion

The installation in Horní Bříza confirms that high-quality Huawei technologies combined with the expertise of our team enable the successful implementation of complex projects, even in revitalized industrial areas. This first delivery of a Huawei Smart Transformer Station Jupiter represents a significant milestone for us, and we believe it will serve as an inspiration for similar projects not only in the Czech Republic but across the European market.

Join us

Discover the benefits of our solar solutions

Your path to a sustainable future

Reference studies

Unique battery storage in an industrial area in the south of Moravia

Hodonín industrial area Tabačka

Implementation date: 6 March 2024

Home

The Hodonín industrial complex Tabáčka, a former tobacco factory with a history of over 150 years, is located in a strategic position between Brno and Vienna.

The complex provides facilities for 45 companies that use production areas, offices and warehouses. Currently, the complex boasts another significant environmental step – the installation of a unique battery storage facility.

Context and challenges

The site is struggling with increasing energy consumption, mainly due to the tenants’ manufacturing operations and logistics operations dependent on electric vehicles.

Even so, thanks to the combination of a 1200 kWp solar power plant, cogeneration and newly installed battery storage, it consumes 99% only green energy.

Solution

In cooperation with the installation company, we have been looking for the optimal solution to the energy needs of the site now and in the years to come. In the end, the choice fell on a unique container battery with a capacity of 4 MWh and an output of 2 MV. The installation is also interesting because it includes several basic components that are modular and easily replaceable. Each container contains 6 separate cabinets with 21 batteries in each, allowing for easy maintenance and eventual replacement of damaged parts.

Features and Benefits

There are several key benefits to the battery storage chosen:

  • Energy optimisation: allows you to buy energy at cheap spot prices and postpone its consumption to times when electricity is expensive.
  • Smoothing of peak demand: reducing the reserved capacity of the site to a minimum and smoothing peak demand.
  • Promoting green traffic: The combination with photovoltaic power plant and cogeneration ensures maximum green operation of the site.

Implementation

The installation and commissioning of the storage was carried out by PV Service plus. The site’s energy system is connected to the local distribution system, but primarily focuses on self-supply. The project also includes a master control system specifically developed for the needs of the site. The test run involved simulating various crisis situations such as charging multiple electric vehicles and simultaneous operation of the production facilities.

Results and impacts

Battery storage significantly improves the energy efficiency of the site. However, working with energy is increasingly important for industrial sites not only because of the cost of energy – the reason for batteries is also the risk of grid overload and meeting ESG conditions. The installation in Tabačka serves as an inspiration for other similar projects due to its power-to-size ratio.

Conclusion

The demand for efficient battery storage in the Czech Republic is growing and the Hodonín Tabačka site can be an inspiration for other companies that are still looking for their way to sustainable operation of industrial sites. The project demonstrates the successful use of modern technologies and provides inspiration for other companies and investors looking for green solutions.

Join us

Discover the benefits of our solar solutions

Your path to a sustainable future

Case studies

Our First Delivered Huawei Smart Transformer Station Jupiter Installed at the Former West Bohemian Ceramics Plant

Former ceramics factory, Horní Bříza

Installation date: 29 April 2025

Introduction

At a former industrial site in Horní Bříza, where the buildings of the West Bohemian ceramics plant once stood, a new 3.7 MWp photovoltaic power plant is now under construction. For this project, we delivered our very first Huawei Smart Transformer Station Jupiter (3 MW) in the Czech Republic, along with other Huawei technologies for power conversion and system control.

Context and challenges

The site has undergone extensive revitalization in recent years, with the goal of creating new, efficiently usable areas. Installing a large-scale solar power plant at this location brings the advantage of leveraging existing infrastructure and strong grid connectivity.

One of the key project requirements was to ensure high-quality technology for reliable power transformation and to prepare the system for future advanced export control capabilities.

Technical Solution

For this project, we supplied the Huawei JUPITER-3000K-H1 Smart Transformer Station, which enables efficient power conversion from string inverters to a voltage level suitable for grid connection.

The delivery also included the Huawei SmartACU2000D-D-01 Smart Array Controller and Huawei SUN2000-330KTL-H1 inverters.

Huawei’s technology ensures high efficiency, reliable operation, and support for advanced export control functions.

The solution delivered for this installation includes 11 units of Huawei SUN2000-330KTL-H1 inverters, accompanied by a Huawei SmartACU2000D-D-01 Smart Array Controller communication unit. This integrated system—combining inverters, the communication interface, and the transformer station from a single manufacturer, Huawei—offers high efficiency, operational reliability, and support for advanced export control features.

Features and Benefits

The selected solution brings several key benefits to the project:

  • High-efficiency power conversion:
    The compact Smart Transformer Station enables straightforward installation and ensures high operational reliability.
  • Export control readiness:
    The use of the SmartACU2000D with SmartLogger prepares the system for the future implementation of dynamic export power control.
  • System flexibility:
    The combination of Huawei string inverters and the control system is scalable and allows for seamless

Implementation

The technology installation was carried out by Archdevelo s.r.o. The process ran smoothly thanks to thorough project preparation, careful site readiness for equipment placement, and overall high-quality project management by the implementation partner.

On our side, we delivered not only the complete technology package but also provided dedicated technical support—both during the project preparation phase and throughout the installation itself.

Results and impact

Once commissioned, this photovoltaic power plant will contribute clean energy to the distribution grid and will be ready to utilize advanced export control functions. We are proud that this project marked the delivery of our very first Huawei Smart Transformer Station Jupiter, strengthening our expertise in utility-scale projects and highlighting the potential of Huawei’s modern technologies in the large-scale solar segment.

Conclusion

The installation in Horní Bříza confirms that high-quality Huawei technologies combined with the expertise of our team enable the successful implementation of complex projects, even in revitalized industrial areas. This first delivery of a Huawei Smart Transformer Station Jupiter represents a significant milestone for us, and we believe it will serve as an inspiration for similar projects not only in the Czech Republic but across the European market.